BASIC PACKAGE hero background
BASIC PACKAGE
Basic Package

VISHWAMAYA BASIC PACKAGE

Focused on essential construction needs, the Basic Package covers core design, electrical, plumbing, and working drawings. It ensures reliable materials, standard specifications, and efficient workflows, creating a strong foundation for residential projects tailored to practical requirements.

PACKAGE OVERVIEW

This package focuses on constructing residential buildings with standard specifications. It includes car parking, multiple floors, and headroom construction, supported by RCC sump and septic tank options. The package ensures durable materials, efficient planning, and compliance with construction standards.

KEY FEATURES OF THE PACKAGE

The Basic Package integrates essential construction drawings, reliable materials, and standard finishes. It aims to deliver functional residential spaces with durable specifications and efficient project monitoring.

  • Elevation design (3D), electrical, plumbing, and working drawings included.
  • Basement height up to 2 feet, ceiling height 10 feet.
  • Standard materials: ARS TMT/GBR steel, Zuari/ACC cement, M20 concrete grade.
  • Bathroom fittings up to ₹13,000 per bathroom, Parryware brand.
  • Flooring: vitrified tiles up to ₹45/sq. ft. for living, dining, kitchen.
  • Daily photo upload via Android/iOS app for project monitoring.
Package - Rs.2199 / sq. ft ( of built up area )
Description of WorkAreaUnitRateTotal Amount
1. Construction of Residential Building - Car Parking1,200sq. ft.209925,18,800
2. Construction of Residential Building - First Floor2,240sq. ft.219949,25,760
3. Construction of Residential Building – 2nd,3rd & 4th Floor6,730sq. ft.21991,47,99,270
4. Construction of Residential Building - Headroom195sq. ft.20994,09,305
5. Construction of RCC Sump as per concrete and steel standards including complete water proofing50,000Ltr2613,00,000
6. Construction of RCC Septic Tank as per concrete and steel standards30,000Ltr267,80,000
7. Construction of Compound wall using 6" Solid Blocks including Plastering and Painting.1,540sq. ft.4256,54,500
Net total : ₹ 2,53,87,635

NOTES

  1. The above quoted price is inclusive of GST at 18%.
  2. Apart from the quoted items and the package specifications, any additional work or upgrades in specifications will incur an additional cost.
  3. Any additional works added during the execution of the project will be updated in this document frequently and be available in customer login.
  4. The quoted rate per unit will remain same throughout the project.
  5. Annexures: (i) Payment Terms (ii) Scope of Work and Material Specification
  6. Our Banking Details : Account Number : 44899028855 | Account Name : VISHWAMAYA ARCHITECTS AND CONSTRUCTIONS | Account Type : Current | IFSC Code : SBIN0011738 | Branch Name : Thirumoorthy Nagar, Chennai
PAYMENT SCHEDULE - ANNEXURE 3All payments to be in advance and as per the below mentioned terms.
Advance PaymentPayment (%)Amount
1. Advance payment for Designs, Soil test & Approval Drawing (Building Approval and its Cost is Customer scope)10%53,87,635
2. Advance payment for Foundation and Plinth Beam Concrete15%38,08,145
3. Advance payment for Super Structure - Ground Floor (on completion of Foundation and Plinth Beam Concrete)15%4,09,305
4. Advance payment for Super Structure - First Floor (on completion of Ground Floor Roof Concrete)15%13,00,000
5. Advance Payment for Block Work and Plastering15%7,80,000
6. Advance payment for Painting, Inner Electrical Concealing and Plumbing works15%6,54,500
7. Advance Payment for Flooring Work, Doors and Windows10%6,54,500
8. Advance payment for Electrical Wiring, Final Painting, Sanitary Fittings and SS Railing5%6,54,500
Total100%₹ 2,53,87,635

NOTES

  1. The above-mentioned rates are inclusive of all taxes and material transportation charges.
  2. Cheque should be drawn in favor of "VISHWAMAYA ARCHITECTS".
  3. Any delays in payments will indirectly affect the schedule of the project and the contract period may be extended.
  4. All payments to be made within four days from the date of payment notification email.
  5. The percentage of part payments mentioned, is fixed and remains same throughout the project, unless any extra floors are added.
  6. The amount split-up mentioned will vary based on the change in work value as per the actual measurements at site, additional works added or upgraded in any material specification.
  7. The digital format of this document with updated amount split-up will always be available in customer login page and all part payments to be made accordingly.